Blastwise
Drill and blast design

Design a blast and watch it fire before you drill.

Blastwise turns a bench pattern into powder factor and tonnes broken in seconds, then lets you set the timing and watch the blast fire, with firing contours and movement arrows. Free to try, no sign-up. Pro unlocks costs, fragmentation, vibration, design checks and printable reports.

Runs in your browser. Nothing you enter is uploaded.

Watch the blast fire

Set hole and row delays, press Play and see every hole fire in order, with firing-time contours and rock movement arrows.

Go deeper with Pro

Cost per tonne, design checks, Kuz-Ram fragmentation, ground vibration and a hole by hole charge sheet, all from the same design.

Take it to the bench

Works on a phone. With Pro, print a PDF report or share a plan image with your manager or blasting engineer.

Blast calculator

An example blast is filled in. Change any number, or load one of the examples.

Examples
Load holes from a file

Export your hole list from Maptek, Vulcan, Deswik, BlastPro, AEL or any other planning package as CSV or text, ideally with a header row. Blastwise reads X, Y, Z, length, diameter and angle and works out the rows, burden and spacing. It never leaves your browser.

Did not load right? Email support@blastwaise.com with the first line of your file (the column names) and the name of your software.

Site and bench

Type these in for free and see them on screen. Printing them on the report and plan image, and saving them with a design, is part of Pro.

Hole and pattern
Charge
Rock
Rock strength and fragmentation

Rock factor A is about 6 for weak rock, 8 for medium, 10 for hard and 12 for very hard, massive rock. The examples use a typical starting value. Calibrate it against your own muckpile.

Ground vibration (estimate)

K and B are typical starting values only. Real vibration depends on the ground, so set them from monitoring at your own site, and use the limit that applies to you.

Timing

Centre initiation with row by row firing gives a full chevron (V1) pattern: delays spread outward from the middle of the front row, pulling rock toward the centre and controlling throw on both sides. Left or right end initiation gives a half chevron (echelon): delays sweep diagonally from one corner, directing the muckpile to one side.

Single hole firing gives every hole its own time, radiating outward from the initiation point one hole at a time, for the tightest control of vibration near sensitive structures. Free shows a worked example at a fixed 100 ms spacing; Pro lets you set your own delay, then fine-tune or override any individual hole's exact time in the Hole by hole timing panel under the simulation.

Try any start point and hole times for free. Saving a design with them is part of Pro.

Unit costs (edit to your rates)

Plan view

Hole section

Drawn to scale along the hole axis. Lengths are measured along the hole.

Timing and simulation

Set the delays on the left, then press Play to watch the holes fire in order. Hole colour in the plan view shows firing time: amber first, blue last.

Hole by hole timing

Click a hole in the picture (double-click it to start the blast there), or type its row and hole number. Row 1 is nearest the free face and hole 1 is the left-hand hole. A time you set is the hole's firing time from the start of the blast. This is where to set your own exact time for every single hole for a fully custom controlled blast. Free to try; saving a design with hand-set times is part of Pro.

Per hole

Whole blast

Blast contours and movement

Fragmentation estimate

Ground vibration estimate

Kuz-Ram calculation, step by step

Hole by hole charge sheet

Stemming and subdrill advice

    Rules of thumb only: stemming about 0.7 x burden (range 0.7 to 1.0), subdrill about 0.3 x burden (range 0.2 to 0.5), burden 25 to 40 hole diameters. Rock, water and your mine's standards come first.

    Geology and blast risk advisor

    Reference table
    Geological featureMain blast riskTypical adjustment
    Faults / open cracksGas venting, flyrock, airblastDecking (air or stemming) across the fault zone
    Hard stringers / dykesOversize boulders, uneven floorSatellite holes, pocket charges, higher-VOD explosive
    Bedding planesBackbreak, poor fragmentationAdjust blast direction to dip and strike; pre-split
    Weathered top layerCratering, poor confinementLonger stemming; coarse angular aggregate
    GroundwaterMisfires, low energy yieldWater-resistant emulsion; short sleep time

    General guidance to start the conversation with your blasting engineer. Geology varies hole by hole, so confirm every change on site against your mine's blast design and code of practice.

    Explosive comparison

    Same hole, same column length and same pattern. Typical density and strength fill in when you pick an explosive; edit them to match your supplier's data sheet. Water in the holes can rule out ANFO.

    Booster and primer count

    Blast log

    The log is stored in this browser on this device only. Clearing your browser data removes it, so download the CSV now and then.

    Design checks

      Planning estimates only. Blastwise does not connect to, program or fire any initiation system or equipment. Every figure must be checked by a competent, certified person and the mine's own blast design and code of practice before use.

      Blast summary

      
                

      Underground blast design

      Declines, inclines and drives, open stope long-hole rings, slot raises and vent raises. Pick a type, edit the numbers, and see the hole count, charge and powder factor. Watch the blast fire in the simulation. Pro adds fume clearance, fan and duct checks and a layout check for ventilation.

      Blast type
      Opening
      Holes and charge
      Vent raise airflow
      Timing for the simulation

      The firing order is a typical pattern, cut first, then helpers, then the walls and roof, with the floor holes last. Replace it with your own delays from your blast design.

      Ventilation (edit to your site)

      Defaults are typical starting points only. Use your fan curve, duct data, explosive data sheet and your mine's re-entry standard.

      Unit costs (edit to your rates)

      Design numbers

      Sketch

      Blast simulation

      Design checks

        Fume clearance and airflow

          Fan and duct layout check

            Cost

            Download

            Planning estimates only. These are rules of thumb and simple models, not a ventilation network simulation or a certified blast design. The mine's ventilation officer, blasting engineer, code of practice and legal requirements decide the final design.

            Ground support (preliminary)

            Rock mass quality from the Q-system, then bolt length and spacing, mesh, shotcrete and quantities for a drive, with the same design checked in poorer ground and at an intersection. A starting point for the rock engineer, not a replacement.

            Rock mass quality (Q-system)
            Opening and drive
            Bolts

            Capacities are typical starting values. Use your supplier's tested figure for the rock and hole size.

            Mesh and shotcrete
            Unit costs (edit to your rates)

            Rock mass and support pressure

              Bolt length and spacing

              Support cross-section

              Schematic and to scale across the opening. Bolt layout in the ring is evenly spaced round the arch and down the walls.

              Mesh and shotcrete

              Support by ground class and area

              Quantities and cost

              Preliminary estimate only. This uses Barton's Q-system (NGI) and simple load calculations. It does not replace a ground control design by a competent rock engineer, your mine's rockfall code of practice or legal requirements. Support must be confirmed on site, against geotechnical mapping and the mine's standards.

              Saved designs

              A Pro feature. Name the design above, then save it to come back to it on this device.

              No saved designs yet. Saved patterns will list here with their powder factor.

                Blastwise Pro

                The full toolkit for taking a design from screen to site. Pay monthly or yearly, cancel any time.

                Pro
                $29 per month, or $290 per year (USD)

                Pay by card in US dollars. The yearly plan costs about 17% less than twelve monthly payments. The free version keeps the blast simulator, so you can try the timing before you pay.

                • Cost per tonne, with your own unit rates
                • Design checks: stemming, burden, spacing, delays, out of sequence holes
                • Kuz-Ram fragmentation, step by step
                • Ground vibration estimate with scaled distance
                • Hole by hole charge sheet
                • Ground support: Q-system bolt length and spacing, mesh, shotcrete, support by ground class and intersection, quantities and cost
                • Underground: full design numbers, fume clearance, fan and duct layout check, cost and CSV for headings, stopes and raises
                • Unlimited hole file imports from your planning software (one free import to try)
                • Geology and blast risk advisor: faults, dykes, bedding, weathering and water
                • Stemming and subdrill advice, explosive comparison, and booster and primer count
                • Blast log with monthly totals and CSV download
                • PDF report, plan image with contours, and CSV downloads
                • Unlimited saved designs with your mine, bench and block details, and design comparison

                Get Pro monthly Get Pro yearly

                Already paid?

                Unlock on this device

                Paste the key from your confirmation email. It can be a Pro key or a free key.

                Free plan

                Get Blastwise on your phone

                Install it from this page. It opens like an app, with its own icon, and the calculator keeps working with no signal.

                Android

                1. Open this page in Chrome.
                2. Tap the three dots at the top right.
                3. Tap Install app or Add to Home screen.

                iPhone and iPad

                1. Open this page in Safari.
                2. Tap the Share button.
                3. Tap Add to Home Screen, then Add.

                Your saved designs stay on the phone you install it on.

                Questions

                Is my data uploaded?

                No. Designs you enter and save stay in your browser on this device. Clearing your browser data removes them, so download a CSV of anything you need to keep.

                Does this replace the blasting engineer?

                No. Blastwise is a planning aid built on common rules of thumb. The site blast design, the blasting engineer's sign-off and your mine's code of practice still apply.

                What is free and what needs Pro?

                Free for everyone: the pattern and charge inputs, powder factor and tonnes broken, the plan view and hole section, and the full blast simulator with timing, firing contours and movement arrows. With a free key (register by email, no card): design checks and 3 saved designs. Pro: cost per tonne with your own rates, underground ventilation checks, Kuz-Ram fragmentation, ground vibration, the hole by hole charge sheet, geology and blast risk advisor, stemming and subdrill advice, explosive comparison, booster and primer count, the blast log, the PDF report, plan image and CSV downloads, unlimited saved designs with your mine, bench and block details, and design comparison.

                How good are the fragmentation and vibration estimates?

                They are rough planning estimates from well known textbook models (Kuz-Ram for fragmentation and scaled distance for ground vibration). Both depend on constants that vary from site to site, so calibrate them against your own muckpile and vibration monitoring.

                How do I get Pro?

                Pay at checkout, then paste the license key from your purchase confirmation email into the unlock box above. It works on that device straight away.

                Can I cancel?

                Yes, at any time. Pro access ends when the period you paid for ends.

                Which units and currency does it use?

                Metric units. Costs are shown per kilogram, per metre and per hole in the currency you pick from the dropdown in the top bar (US dollars by default), and you can type your own rates.

                Does it support chevron (V1) and half chevron (echelon) firing patterns?

                Yes. In the Timing section, set Firing pattern to row by row and Initiation point to Centre for a full chevron (V1) pattern, where delays spread outward from the middle of the front row. Set Initiation point to Left end or Right end for a half chevron (echelon) pattern, where delays sweep diagonally from one corner. The simulator shows the firing contours and movement so you can see the shape before you drill.

                Can I do single hole firing for a fully controlled blast?

                Yes. Set Firing pattern to Single hole firing (fully controlled) and every hole gets its own firing time, radiating outward from the initiation point one hole at a time. Free shows this as a worked example at a fixed 100 ms spacing; Pro lets you set your own delay between holes, and you can also type an exact firing time for any individual hole in the Hole by hole timing panel under the simulator, for full manual control over every hole in the blast.